Passenger Elevator Products | Automatic Elevator Products | China Elevator Product Manufacturers
Industry News

Elevator Maintenance System

Views : 1006
Update time : 2019-08-02 13:23:00

1 weekly maintenance check

Elevator maintenance personnel every two weeks to the main organs and parts of the elevator for a maintenance, inspection, and carry out a comprehensive cleaning, dust, lubrication and other work. Every workload should be determined by the elevator floor station, usually not less than 2 hours.

2 quarter maintenance check

Elevator maintenance personnel every 90 days or so, the elevator's important parts and electrical devices for a slight adjustment and inspection, depending on the elevator station and its workload, usually each time of use is no less than 4 hours.

3 maintenance check

Each lift after one year of operation, by professional elevator maintenance unit technology director, arrange maintenance staff to conduct a comprehensive inspection, the elevator mechanical components and electrical equipment and auxiliary facilities maintenance, and conduct a comprehensive safety performance test according to the technical standard, the detection of qualified, declaration of acceptance to the relevant departments, handle the formalities for the use of the year.

Contact information:

Factory Add: No.88 Changjiang Road, Wuzhong District, Suzhou City, China.215211

Email:jackie@hitech-elevator.com

 TEL:0086-512-66038303 

More About Us

COPYRIGHT © HITECH ELEVATOR CO.,LTD